09/22 Classwork & Homework
Tuesday, September 22, 2015

Lessons-Part 1:   From the Promethean Board  [...see image below]

Classwork:   A.T.N. Problem 2.5 (pg.31) - use Labsheet 2.5  ...available as a downloadable PDF document below

Turned-in:   nothing

Homework:  Complete classwork- A.T.N. Problem 2.5 (pg.31) ...if not completed in class today -- use Labsheet 2.5  ...available as a downloadable PDF document below

Notes: 

  • REMINDER:  At most, homework is designed such that students should spend 30-40 minutes maximum of focused effort on their homework assignments on any night. (*Please note that not all assignments are designed to take 30-40 minutes, that is only the maximum time... most homework assignments should be able to be accomplished in less time.) If an assignment is taking longer than that, students should stop working, and come in with the work, as completed, for class the next day to discuss with the teacher the issues the student may be having that is making it difficult for him/her to complete the assignment

 

Lesson -PART 1  (from Promethean Board - 9/22/15)
Lesson -PART 1 (from Promethean Board - 9/22/15)
PDF ATN Labsheet 2.5 (Questions C&D)   --  ATN Labsheet 2.5 (Questions C&D)
PDF Coordinate grid (-10 to 10)   --  Coordinate grid (-10 to 10)